Top Level:

Brown Bag (10/2)

KHA-SD Help Group Policy SD Config Client Management CAD Info & Help Projects Site Map

Peer Level: Up Brown Bag (12/14) Levels Brown Bag - Nov 30 Brown Bag - November 26, 2007 Brown Bag (11/7) S&S Brown Bag (10/2) Brown Bag (09/19) Brown Bag (07/22)

Child Level:
Up

Brown Bag Topics - Oct. 2

Training Plan

My personal plan is to (feedback is welcome).

  • I need to get my manuals available electronically (not pdf)
  • Make everything completely modular:
    • Topic-based narrative and screenshots
    • Topic Labs w/ enscapsulated labs (exactly what you need with no setup pre-requisites).
    • Screencams (two-minute max workflow run-throughs).
  • Provide Major and Minor Workflow Task Sequences pages with lab links.
  • Provide As-Needed and Training Topics Skill Building pages with lab links as Training Units.

Deadlines collapse buildings, but they also get them built.

Let's make a training commitment sustainable for a few months.

Configuration Things You Need to Know

  • Changing Clients (default is CalTrans v7+ Imperial D11)
  • v7-v8 Interoperability
  • Creating a new ustn file (seeds)
    • CTv7 seeds have crap in them and four views for 3D.  Do we want to clean this up?
  • Level Manager
  • MicroStation User Configuratables
  • CalTrans v7+ Standards
    • the dgnlib
    • any frequent customizations (like font 114) that need porting?
  • Explanation of the InRoads v8.9 Setup
    • Status:  a good start, useable, but much remaining
    • Project Defaults and the Xin File
    • Feature Styles
    • Symbology
    • Command Setup (lots remaining)
      • Metric v. English
    • How you can help me help you
  • Managing Geometry Data
    • Need  a single Geometry Manager per project
    • Geometry Styles
    • Multiple Files: logical breakup
  • Proposed Surfaces (it's what we do!)
  • Typical Sections Overview

Long term Question:

There's a saying: don't let someone else's emotional problems or deficiencies become your emotional problems or deficiencies.  It begs the questions:  should a clients limited and deficient deliverable environment dictate our designing and production.

I don't think 63 levels is enough (well, at least how CalTrans designates them).  For example, I like to Work w/Shoulders and ETWs on different levels, one level is not enough segregability for all drainage structures.  We can develop an "extended" environment and a translator to the Caltrans v7+ standard (and an automatic translator for v7 (actually that's already in place).  Deviating from a client deliverable standard requires some extra step to put the genie back in the bottle.  It can be a simple step. 

Couple of notes related to this: 3rd floor is already looking at a broad National CADD Standard and CalTrans will be expanding out of their tiny box in the next year or so...

Data Management

  • Eliminate Cranial Single Sourcing
  • Minimize the need to reverse engineer the engineering (big time waste).
  • Document as you go, keeping collaborators in mind.  Keep it simple and quick.
  • Use inline documentation whenever possible.
  • Eliminate ambiguity.
  • Assigned Roles: Project Data Manager?
    • basic documentation of what's going on with the data
    • can be a simple read me
    • should point to standards, standards files
    • data management convention

File Management (805/Van Buren)

  • The Design InRoads folder vs. Design/TEMP/<user> folder
  • Naming Conventions
    • The criticality of clarity
    • Existing vs. Proposed
    • Good vs. Bad vs. Temporary vs. "Working"
  • Archiving and Archives

Van Buren

A Thousand Points of light and an Alg for every alignment?

Existing Data Discussion

InRoads Coordination

 

Site Map       Contact Jeff Martin with comments/concerns.        KHA San Diego Transportation Group.                    this page last edited: 2008-01-17 16:26